Whiteboard Prompts Get the kit
Home / Workshops / Backlog prioritization

Backlog prioritization with RICE on Claude Whiteboards

Score up to 20 backlog items with RICE, place them on an impact/effort grid, challenge the surprises and draw a cut line at your team's capacity.

60 minutes · 3–8 people · 9 prompts · first prompt free

Use it when: Before quarterly or sprint planning, when a PM and 3 to 8 people from product, design and engineering must agree what gets built next.

Backlog title
Capacity
Candidates
Scoring tableIDItemRICERICE
Impact / effortQuick winsBig betsFill-insMoney pits
The board after the setup prompt, to scale. Claude draws these empty sections; your team fills them in over the next 8 steps.

Backlog prioritization

60 minutes · 3–8 people · 9 prompts in order

First step free

What you type here fills every prompt below and stays in this browser.

  1. 0′Lay out the board
  2. 3′Load the candidates
  3. 8′Agree the scales
  4. 12′Score Reach and Effort
  5. 24′Score Impact and Confidence
  6. 34′Calculate and rank
  7. 38′Place items on the grid
  8. 43′Challenge the surprises
  9. 52′Draw the cut line

Agenda, 60 minutes. Click a time to jump to its step.

Before the meeting
  • Export up to 20 candidate items from Jira, Linear or your tracker as a plain list, one per line. Claude only sees what is on the board, not your connected apps, so the list has to be pasted.
  • Ask the PM to bring a Reach number for each item from analytics, and the engineering lead a rough Effort in person-months. Scoring from memory doubles the time of step 4.
  • Agree the team's real capacity for the period with the engineering manager before the session, after holidays, on-call and maintenance work are taken out.
  1. 0–3 min

    Lay out the board

    Run this before people join. Check that the table is in the middle and the grid on the right has its four quadrant labels.

    Start a whiteboard to prioritize the Q1 2027 backlog for the Quillpay invoicing app. Across the top, add a title and a sticky note labeled "Capacity: 6 person-months". On the left, add an empty section called "Candidates". In the middle, add a section called "Scoring table" laid out as a table with the columns ID, Item, Reach, Impact, Confidence, Effort, RICE. On the right, draw a 2x2 grid called "Impact / effort" with Effort on the horizontal axis (low on the left, high on the right) and Impact on the vertical axis (low at the bottom, high at the top). Label the quadrants: top left "Quick wins", top right "Big bets", bottom left "Fill-ins", bottom right "Money pits". Leave the table and the grid empty.

    Board after this stepTitle with the capacity note, an empty Candidates section, an empty scoring table, an empty 2x2 grid.

  2. Steps 2 to 9 are in the workshop kit

    You have the setup prompt and the full agenda. The kit adds the other 8 prompts of this backlog prioritization, what to do while Claude works on each one, and 3 follow-up prompts: Scoring sheet with live formulas, Roadmap doc for stakeholders, Send to Miro or Lucid. The same for all 12 workshops, plus the 40-prompt library.

    One payment, no subscription. Opens in this browser as soon as Stripe checkout completes.
  3. 3–8 min

    Load the candidates

    In the kit

    Put each of these backlog items on its own sticky note in "Candidates", numbered B1, B2, B3 and so on in the order I paste them …

    Board after this stepTen to twenty numbered notes, and the same IDs as rows in the table.

  4. 8–12 min

    Agree the scales

    In the kit

    Above the scoring table, add a section called "How we score" with five sticky notes …

    Board after this stepA five-note legend sits above the table where everyone can see it while scoring.

  5. 12–24 min

    Score Reach and Effort

    In the kit

    Fill in the Reach and Effort cells using only the numbers I give you …

    Board after this stepReach and Effort filled for every row. Red cells show what still needs an estimate.

  6. 24–34 min

    Score Impact and Confidence

    In the kit

    Fill in Impact and Confidence with the values I give you …

    Board after this stepEvery row has four scores, or red cells the team still has to settle.

  7. 34–38 min

    Calculate and rank

    In the kit

    Calculate RICE for every row as Reach × Impact × Confidence ÷ 100 ÷ Effort, rounded to a whole number, and write it in the RICE column …

    Board after this stepA sorted table with the arithmetic visible for the top five.

  8. 38–43 min

    Place items on the grid

    In the kit

    Place a copy of each scored item's sticky note on the "Impact / effort" grid …

    Board after this stepEvery scored item sits in one of Quick wins, Big bets, Fill-ins or Money pits.

  9. 43–52 min

    Challenge the surprises

    In the kit

    Look only at this item …

    Board after this stepDisputed items carry a Driven by note and a Check note. Any score the team changed is updated in the table.

  10. 52–60 min

    Draw the cut line

    In the kit

    Walk down the sorted scoring table and add up Effort from the top …

    Board after this stepCommitted items in green above the line with owners, everything else in grey below it.

After the meeting

  • Scoring sheet with live formulas

    In the kit

    Create a sheet from the scoring table on this board with the columns ID, Item, Reach, Impact, Confidence, Effort, RICE, Status, Owner …

  • Roadmap doc for stakeholders

    In the kit

    Turn this board into a one-page prioritization doc with these sections …

  • Send to Miro or Lucid

    In the kit

    Before I send this board to Miro, tidy it …

What goes wrong on Claude Whiteboards

  • Check the arithmetic. Claude calculates RICE on the board, and a slip on one row can move an item across the cut line. The step 6 prompt shows the calculation for the top five so you can check them in seconds; for the full list, move the table to a sheet with real formulas.
  • 2 more pitfalls for this workshop are in the kit

Board layout

Backlog title
Capacity
Candidates
Scoring tableIDItemRICERICE
Impact / effortQuick winsBig betsFill-insMoney pits
The board after the setup prompt, to scale. Claude draws these empty sections; your team fills them in over the next 8 steps.
You leave with

A board with a sorted RICE table showing the calculation for the top five, a 2x2 impact/effort grid with every scored item placed, and a cut line marking what is committed within capacity. Plus a scoring sheet with live formulas and a short roadmap doc.

Agenda at a glance

MinutesStepWhat the board shows afterwards
0–3Lay out the boardTitle with the capacity note, an empty Candidates section, an empty scoring table, an empty 2x2 grid.
3–8Load the candidatesTen to twenty numbered notes, and the same IDs as rows in the table.
8–12Agree the scalesA five-note legend sits above the table where everyone can see it while scoring.
12–24Score Reach and EffortReach and Effort filled for every row. Red cells show what still needs an estimate.
24–34Score Impact and ConfidenceEvery row has four scores, or red cells the team still has to settle.
34–38Calculate and rankA sorted table with the arithmetic visible for the top five.
38–43Place items on the gridEvery scored item sits in one of Quick wins, Big bets, Fill-ins or Money pits.
43–52Challenge the surprisesDisputed items carry a Driven by note and a Check note. Any score the team changed is updated in the table.
52–60Draw the cut lineCommitted items in green above the line with owners, everything else in grey below it.

Run every workshop, not just the retro

Anthropic's help page gives three sample prompts. Free prompt packs give single prompts. The kit gives you the whole session: what to paste, in what order, how many minutes each step takes, what you do while Claude works and what the board should show before you move on.

Free hereWorkshop kit
Sprint retrospectiveThe whole scriptThe whole script
The other 11 workshopsAgenda, board layout and the first promptEvery prompt in order, with what you do at each step
Prompts that turn the board into a doc, deck, tracker sheet or Miro boardRetro onlyFor every workshop (40 in all)
Mistakes to avoid on Claude WhiteboardsOne per workshopAll of them
Single-job prompt library10 promptsAll 40
Copy, print or download a scriptRetro onlyAll 12, plus the whole kit as one Markdown file
A finished Claude Whiteboards launch timeline with sticky-note milestones from Day 1 to Day 12
A finished launch board from Anthropic's demo. The launch plan script builds this kind of board, then adds lanes, owners and a risk pass.

$19one payment

No subscription. Checkout by Stripe; the kit opens in this browser straight after. On another device, ask for a sign-in link sent to the email you paid with.